Lateral Inspection Requirements:
1. Both of these forms must be submitted to the Inspector at the time of the Lateral Connection Inspection.
2. Photos from the home to the lateral connection must be attached to the inspection forms.
3. Upon the inspectors arrival, the builder is to hand the completed forms and pictures for his review and approval.
4. If the forms are not complete, including photos of the entire run, the inspection will not be approved.